Project Archives

Ship Fitted Saturated Dive System

Due to the shipyards requirement for the entire dive system to be supplied as a 3D model, including the kilome-tres of 3/8” to 1” instrument lines, Quadro was commissioned by an international saturated dive system supplier to compile this project

Tagged with: ,
Posted in Quadro Projects

Mine Site Wash Plants

We are working with a large Australian vehicle wash plant company on a number of large mining equipment wash plants that are site specific to meet the particular needs of the mine site. The first part of the project is

Tagged with: ,
Posted in Quadro Projects

Mining Structures

We are often called upon to re-design or modify existing mining equipment & associated structures due to changes or improvements in materials handling or mineral extraction processes. In some cases the re-design is required due to poor performance of the

Tagged with:
Posted in Quadro Projects

Pump Skid

Over the years we have done quite a number of pumping and equipment skids for a variety of projects and clients. The skid shown in the pictures is a high pressure chemical injection skid for a Western Australian Oil and

Tagged with:
Posted in Quadro Projects

Wasabi – Parts Washer

This has been a rewarding design project for both Quadro Design and the inventor as the idea past from conceptual design through to detailed design and drafting of a revolutionary range of industrial parts washers for Wasabi (Holdings) Pty Ltd.

Tagged with:
Posted in Quadro Projects

SJ Crushing – Koolan Island Crushing Plant

SJ Crushing was awarded the contract to supply, install, run & maintain the crushing and screening plant for Aztec Mining’s (now Mount Gibson Iron Limited) Koolan Island iron ore operation. Quadro Design undertook the design & detail drafting of the

Tagged with: , ,
Posted in Quadro Projects

WAMskirt

Quadro worked in conjunction with Wear Applications & Management Services Pty Ltd (WAMS) to develop a number of patented and innovative products. WAMskirt – a modular skirt liner system for quick install & maintenance that eliminates confided space entry for

Tagged with: ,
Posted in Quadro Projects

KLEN Flux Filler

The KLEN Flux Filler has been designed to significantly reduce the incidence of elevated lead levels experienced by Fire Assay Laboratory workers—especially those directly involved in the preparation of samples for firing. The KLEN Flux Filler also significantly reduces the

Posted in Quadro Projects

WAMS – Tripper Chute

Quadro worked in conjunction with WAMS Pty Ltd to resolve issues with a tripper chute at the Paraburdoo Mine site. WAMS is a uniquely experienced supplier of wear protection systems and performance management services to the mining, quarrying and minerals

Tagged with: ,
Posted in Quadro Projects

Syntect – Finucane Island Berth C Upgrade

Quadro assisted Syntect Consulting Engineers with the Finucane Island Berth C Upgrade by providing a team of 1-2 people for 6 months to model the new Berth C components, per the MPD JV drawings, plus the existing Berth D, new

Tagged with:
Posted in Quadro Projects